Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · (954) 807-3208
Romco StructuralCall

What we repair · Railings & Guardrails

Railings — Where Repair Becomes Replacement

Railings are usually found deteriorated at their embedments, and replacing them frequently triggers current code requirements the original did not meet.

We will turn it into a buildable scope, a phasing plan and a realistic range — so the board can decide with numbers rather than adjectives.

Not us

We do not perform the inspection. An engineer does

30/25

Years to first milestone — 25 within 3 miles of coast

Occupied

Buildings stay occupied while we work

Licensed

General contractor, licensed in the state of Florida

The old railing was legal and the new one has to be current

Guardrail height, opening dimensions and load requirements have changed over the decades. A railing installed in 1978 is not required to be upgraded while it remains — but replace it and the new one is built to current requirements. Boards budget for a like-for-like swap and receive a quote for something different, and nobody explained why.

The cost surprise compounds because the embedments have to be repaired before anything is installed. A board that budgeted for a railing replacement receives a quote covering concrete repair at every post location as well, and it reads as scope creep rather than as the actual condition of the structure the railing was bolted into.

What changes on replacement

  • Guardrail height, frequently taller than the original.
  • Opening dimensions, which govern the infill design.
  • Load requirements, which govern the attachment.
  • Embedment repair, since the failure is usually where it meets the concrete.
  • Material choice — aluminum, glass or steel — with very different lifespans in salt.

Why the concrete at the post is always worse

A railing post penetrates the surface of a balcony or a deck, which means water has been running down the outside of that post and into the concrete around it for as long as the building has stood. The result is that the concrete at the posts is reliably the most deteriorated concrete on the whole element.

That is also why replacing railings without repairing the embedments is a cosmetic exercise on a structural problem. The new railing is bolted into the same deteriorated material, and it will loosen on the same schedule the old one did.

How we handle it

  1. 01Assess the embedments, which is where the deterioration actually is.
  2. 02Establish current requirements with the engineer before pricing.
  3. 03Repair concrete at each attachment before installing anything.
  4. 04Install to current code and to the specified attachment detail.
  5. 05Document each attachment for the engineer's sign-off.

The railing itself is rarely the problem. The problem is the concrete it is anchored into, which has been letting water down the post for years. Any railing project that does not repair the embedments is a cosmetic exercise on a structural failure.

Said plainly

Where we stop

Painted steel railings in a coastal environment will be back within years. We will tell you that even when the aluminum or stainless option is a harder number for the board to approve.

FAQ

Common questions

Why does the new railing look different?
Replacement triggers current code — height, openings and loads have changed since the original was installed.
Can we just repaint them?
Only if the embedments are sound. Usually they are not, and paint hides that.
Which material lasts longest here?
In salt air, aluminum or stainless over painted steel, by a wide margin.
Does the engineer sign off railings?
Attachments generally require engineering sign-off. We document each one.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.