Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · (954) 807-3208
Romco StructuralCall

What we repair

Seven Things a Milestone Report Finds

Concrete, balconies, the envelope, waterproofing, railings, the garage and the roof. These are what Phase 2 reports actually contain.

We will turn it into a buildable scope, a phasing plan and a realistic range — so the board can decide with numbers rather than adjectives.

Not us

We do not perform the inspection. An engineer does

30/25

Years to first milestone — 25 within 3 miles of coast

Occupied

Buildings stay occupied while we work

Licensed

General contractor, licensed in the state of Florida

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.