What we repair
Seven Things a Milestone Report Finds
Concrete, balconies, the envelope, waterproofing, railings, the garage and the roof. These are what Phase 2 reports actually contain.
We will turn it into a buildable scope, a phasing plan and a realistic range — so the board can decide with numbers rather than adjectives.
Not us
We do not perform the inspection. An engineer does
30/25
Years to first milestone — 25 within 3 miles of coast
Occupied
Buildings stay occupied while we work
Licensed
General contractor, licensed in the state of Florida
7 what we repair
Each page explains what drives the quantity, because quantity is what drives the price.
Concrete Restoration
concrete restoration condo milestone florida
Read more →
Balcony Repairs
condo balcony repair milestone inspection florida
Read more →
Building Envelope
condo stucco waterproofing repair florida
Read more →
Waterproofing & Decks
condo deck waterproofing pool deck repair florida
Read more →
Railings & Guardrails
condo balcony railing replacement code florida
Read more →
Parking Structures
parking garage repair condo florida milestone
Read more →
Roof & Rooftop Structures
condo roof replacement milestone inspection florida
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.